Barrier Master for guide rail removal
- Up to 15 tonnes of pulling force
- Proven to be 10 times faster than conventional methods
- Can be fitted to a range of carriers including excavators, skid steers and lorry-mounted cranes.
- Delivery time is approximately 10 weeks.
Barrier Master for guide rail removal
- Up to 15 tonnes of pulling force
- Proven to be 10 times faster than conventional methods
- Can be fitted to a range of carriers including excavators, skid steers and lorry-mounted cranes.
- 3 models available
The Barrier Master removes all types of posts. From guide rail posts to lamp posts and solar panel posts. The post puller can safely remove larger posts with heavy foundations. The Barrier Master is mainly used along highways.
Traditional pile removal methods using chains, cranes and plate clamps are all designed for ‘lifting’ and not ‘pulling’. These methods can jeopardize worker safety. The unique design of the Barrier Master ensures that the traction force is directed to the ground, without the risk of thrown parts, making for a safe and effective solution.
Fully controllable from the safety of the driver’s cabin (or remote control for crane model)
See the specifications for the correct Barrier Master for your machine in the table at the bottom of this page.
MODEL: | BM10-2 E | BM10-2 C | BM12-2 E | BM12-2 C | BM15-2 E | BM15-2 C |
Width at base ( mm) | 1450 | 1450 | 1450 | 1450 | 2040 | 2040 |
Height-retracted (mm) | 1415 | 1624 | 1910 | 1910 | 1930 | 1930 |
Height-extended (mm) | 1950 | 1950 | 2390 | 2390 | 2410 | 2410 |
Depth- front to rear (mm) | 943 | 943 | 970 | 970 | 1260 | 1260 |
Max jaw opening (mm) | 243 | 243 | 243 | 243 | 303 | 303 |
Min jaw height from ground (mm) | 85 | 85 | 115 | 115 | 130 | 130 |
Max footing width (mm) | 1000 | 1000 | 1010 | 1010 | 1500 | 1500 |
Pulling force (kN) | 100 | 100 | 150 | 150 | 150 | 150 |
Pulling stroke (mm) | 755 | 755 | 1000 | 1000 | 1500 | 1500 |
Approx operating mass (kgs) *Excluding excavator headstock | 698 | 748 | 868 | 918 | 1302 | 1386 |
Hyd input pressure (bar) | 200-250 | 200-250 | 200-250 | 200-250 | 200-250 | 200-250 |
Hyd input flow main + secondary (l/min) | 60+40 | 60+40 | 100+40 | 100+40 | 100+60 | 100+60 |
Auxiliary power circuits required | 2 | 2 | 2 | 2 | 2 | 2 |
Hydraulic flat face Q/R couplings | ½ BSP | ½ BSP | ¾ BSP | ¾ BSP | ¾ BSP | ¾ BSP |
Carrier examples shown for reference only. Can be mounted on variety of different carriers which must be rated for attachment weight. | 360 Excavator 5+ Tonne Class or above | Lorry Mounted Crane. | 360 excavator 6+ tonne Class or above | Lorry Mounted Crane. | 360 excavator 8+ tonne Class or above | Lorry Mounted Crane. |
Filename | Size |
---|---|
Barrier Master Technical Data | 22 KB |